Page 1 of 1

Provides timely information

Posted: Wed Feb 12, 2025 9:28 am
by rakhirhif8963
Don’t forget about public relations ( PR ). Whether the DR plan is for in-house systems or cloud-based systems, it needs to be coordinated with internal PR and a plan to communicate to the board, shareholders, employees, and customers in the event of a major system outage. A well-designed PR strategy that to all stakeholders can go a long way in maintaining trust in the company and reassuring people in the event of a disaster.

Security in Java and beyond
Alexey Poletaev | 07.08.2018
What is information security? It is a state of information macedonia whatsapp data that ensures its confidentiality, availability and integrity.

Usually, in order to assess the state of information security, it is necessary to understand and analyze threats and their sources, assess the level of damage, the likelihood of implementation and relevance of threats, risks (optional) that may affect our system/information.

In my opinion, it is impossible to assess the security of a particular technology or programming language without reference to a specific implementation method, i.e. without a specific ready-made software product in a language that has a detailed technical specification with a description of the architecture and functionality. But this will not be enough, since it is necessary to assess the security status of a ready-made information system with its specific architecture, set of components, business processes, information and, finally, people. Let me give you an example of building a house. We have materials (sand, cement, crushed stone, brick, etc.) and tools (bucket, shovel, spatula, etc.). We will not be able to assess the quality and reliability of a finished house solely by the materials/tools used: how long it will stand, will there be cracks in it, will it be cold or quiet in it. We need to choose a house design, construction technologies and a team of craftsmen. And only after the completion of construction we will be able to measure compliance with the project, GOST, SNiP, check measurements for thermal protection, noise, loads, analyze the quality of cement and answer most questions. But we will not have an exact answer to the main question "how long will it stand?", since we do not know all the operating conditions of the house and all the factors that will affect it throughout the entire time.