However, according to Igor Dorofeev, parallel import for data center engineering systems that have a life cycle of more than 10 years is not in great demand without a thorough risk analysis.
Maria Markova, Commercial Director of OOO Svyaz VSD (provider of Linx data center and cloud services), believes that the price growth figures of 30-40% per rack space are a bit lithuania whatsapp number database overstated: "We can confidently talk about growth within 20-30%. This is partially transferred to the cost for the client, but data center operators are cautiously raising prices so as not to lose clients who may start looking for alternatives."
space in data centers is growing due to the influence of several factors: for example, the cost of electricity is increasing simultaneously with the needs of clients who request up to 20 kW per rack. "The construction of new data centers is accompanied by an increase in capital expenditures. Old data centers experience an increase in operating expenses (up to 15% per year), associated, among other things, with the need for modernization. The shortage of equipment and the need to rebuild supply chains affects them as well: server equipment from Eastern manufacturers can be purchased at the same prices, while Russian equipment is somewhat more expensive," added Maria Markova.
"It is impossible to import the usual European equipment for data centers. And what can be imported has become more expensive. The main reasons for this include the rising cost of energy resources in Europe, sanctions restrictions, and complex logistics chains. In 2023, there has not yet been a significant change in price for the end user. This is due to the fact that most of the newly imported equipment has not yet been put into operation. However, in the future, prices will definitely increase," said Pavel Gurin, Head of Data Center Design and Construction at K2 Integration JSC (K2Tech system integrator).
The "stuffing" of data centers cannot yet be replaced by Russian analogues
Sergey Nikitin, head of the sales department of SiTri Solutions LLC (Russian manufacturer of C3 Solutions equipment), explained that the equipment needed to launch data centers is divided into three groups: hardware to maintain the operability of the data center itself (diesel generators, uninterruptible power supplies, air conditioners), engineering infrastructure for machine rooms (server cabinets, trays, corridor insulation systems) and active server equipment (the "stuffing" for cabinets).
According to him, in the second segment there is a large selection of Russian analogues that are not particularly inferior to Western manufacturers, and in the first segment, customers have access to both Russian and Chinese analogues, but there is no complete certainty that they will be as reliable as the equipment of the departed Western vendors. "Data center builders have a difficult choice: continue to import Western products through parallel import schemes, to which they are accustomed and whose quality they do not doubt, or take a risk and try Russian or Chinese. The first option is certainly more expensive," explains Sergey Nikitin.
As Maria Markova explains, the average cost per rack
-